Evie Dennis Locker Rooms

Denver, Colorado

Evie Dennis Locker Rooms

Denver, Colorado

Upgrading Facilities to Support Growing Athletics

UG Group (formerly 2WR+ Partners) led the expansion of K-12 Locker Rooms at Evie Garrett Dennis Campus in Denver, Colorado. With increasing student enrollment, the existing multi-functional classroom and team rooms were no longer sufficient. To meet growing athletic demands, we designed a strategic addition to the middle school, providing dedicated spaces for student-athletes.

The expansion features separate locker rooms for home and away teams, modern restrooms, ample equipment storage, and a specialized sports trainer facility. Additionally, the design integrates seamlessly with the existing building, following its curved layout for a cohesive and modern appearance.

Thoughtful Design for K-12 Locker Rooms

Durability, functionality, and ease of maintenance were key priorities in designing these K-12 Locker Rooms. UG Group incorporated several design elements to ensure long-term performance, including:

  • Resilient Materials – CMU walls, durable flooring, and robust fixtures create a long-lasting, low-maintenance space.
  • Spacious and Accessible Layout – Wide doorways and expansive restrooms improve accessibility and usability for athletes.
  • Optimized Natural Light – Strategically placed high windows and solar tubes allow natural light to enter while maintaining privacy.
  • Flexible Use for Multiple Sports – The locker rooms accommodate various teams, making the facility adaptable for different seasons and events.
  • Seamless Integration with Existing Architecture – The design follows the school’s curved layout, ensuring aesthetic and functional cohesion.

A Modern, Sustainable Athletic Facility

The upgraded K-12 Locker Rooms at Evie Dennis Campus enhance the school’s ability to support student-athletes and athletic programs. By focusing on sustainability, efficiency, and user experience, UG Group created a space that meets the needs of both current and future students.

Additionally, the facility supports multiple athletic programs, creating a versatile space that benefits the entire school community. The combination of durable materials, modern amenities, and energy-efficient features ensures a high-quality athletic experience for years to come.

With a design that prioritizes durability and accessibility, this expansion strengthens the school’s athletic infrastructure. The result is a high-performance facility that fosters school spirit, teamwork, and long-term growth.

 

FEATURED PROJECTS

Let UG Group build your path forward

PROJECT

UG Group (formerly Dawson Van Orden) provided engineering expertise and pre-design consultation…

PROJECT

UG Group (formerly 2WR+ Partners) provided architectural expertise for the Callaway Field House…

PROJECT

UG Group (formerly 2WR+ Partners) played a pivotal role in designing the YMCA in Columbus…

Ready to Start Your Project?

Experience a simplified turnkey design process from concept to projection completion when speed to market matters.

Scroll to Top